The boiler needs to be started and stopped frequently during the use of the boiler. If the boiler is not maintained on time during use or the boiler is not baked before the boiler is officially started, these situations can easily lead to internal problems in the fluidized bed boiler. Shedding of building materials. In view of this situation, during the installation of the boiler, it should be configured strictly in accordance with the material ratio drawings in the construction drawings, and corresponding experiments should be carried out. The reason for this is that the wear-resistant pouring materials are not very commonly used in actual construction. Therefore, do a smear experiment before smearing, and accurately grasp the mixing time of the wear-resistant pouring material and the solidification time of the material to ensure the construction quality of the entire project.
Pouring is the key to the installation and repair of the entire boiler. Before construction, the construction personnel should make templates according to the specific construction position. In the actual construction process, use wooden boards as the template. This is relatively simple. After the construction, it does not need to be disassembled. The maintenance of the grinding material is also very helpful.
It is best to use the method of integral pouring when pouring. Expansion joints should be reserved in accordance with the specifications during specific construction. This measure can prevent the boiler from being heated during operation, causing the pouring material to expand and causing delamination and shedding.